1
2
3
Iteration 1: Low-fi Concept
After the Stakeholder and SME review, they don’t want to have the plan adjustable here since they want to increase active FGA users.
Also, I added more content that stakeholders think is useful for the users.
Iteration 2: Concept Wire Testing
User Feedback:
They like Combined Details and What if the scenario is accessible.
Adjustable from here is preferable but not critical.
The left side has a little too much information than they need. So we categorize the information as Necessary, Good to have, and Not necessary.
Iteration 3: Prototype
Pushed “Good to have” contents in the drawer for easy access.
Made popular information into Individual cards for better readability.
Goals are associated with the probability of success and plan net worth.
Added SME/Stakeholder’s requirement contents.